When a business is dealing with toxic waste in what’s considered a potentially risky way it must get a permit from California’s Department of Toxic Substances Control. There are currently 118 permitted facilities in the state that treat, store or dispose of toxic waste.
A recent report commissioned by the Department shows its permitting process is confusing and takes too long. A renewal takes more than four years on average. DTSC Deputy Director Brian Johnson said he would like to cut that time in half.
“Our explicit intent at this point is to ensure that the permits we come out with are more timely,” he said, “without sacrificing any of the quality and the defensibility and enforceability of the permits.”
Johnson said a more traditional management structure is being put in place to improve the permitting process.
But Liza Tucker thinks the problems run deeper. She’s an advocate with the non-profit organization Consumer Watchdog. She’s written a report that’s critical of DTSC.
“I think it’s more a problem of willpower than manpower,” she said. “I think that this is an agency that’s been largely captured by the industry that it regulates, that engages in a lot of foot-dragging. And, inside of which, different divisions don’t necessarily communicate very well.”
Johnson said he doesn’t agree with Tucker’s assessment and said he has confidence in the permitting division.
Follow us for more stories like this
CapRadio provides a trusted source of news because of you. As a nonprofit organization, donations from people like you sustain the journalism that allows us to discover stories that are important to our audience. If you believe in what we do and support our mission, please donate today.
Donate Today